Earth’s Cryosphere, 2017, Vol. XXI, No. 6, p. 84-94

THE METHOD OF SELECTING PROJECT SOLUTIONS FOR LAYING THE LINEAR PART OF OIL PIPELINE IN PERMAFROST

A.Yu. Gunar1, L.N. Khrustalev1, V.Z. Khilimonyuk1, L.V. Emelyanova1,
V.V. Trofimov2, A.A. Zhang1, V.I. Surikov3, A.A. Korotkov3

1 Lomonosov Moscow State University, Faculty of Geology, Department of Geocryology,
1, Leninskie Gory, Moscow, 119991, Russia; gunar_91@mail.ru

2 Joint Institute for Nuclear Research, 6, Joliot-Curie str., Dubna, 141980, Russia
3 LLC “Research Institute of Transneft”, 47a, Sevastopolsky ave., Moscow, 117186, Russia

The proposed methodology for selecting optimal design solutions for oil pipeline laying in the permafrost zone is based on probabilistic approach to predicting thermal and mechanical interactions between a buried pipeline and frozen soils. It allows choosing the optimal pipeline routing, laying techniques and design parameters, in keeping with the principle of minimum initial investment and loss contingency.

Permafrost zone, oil pipeline, reliability function, risk function, cost of risk, total present value, cots-based engineering-geocryological map, pipeline laying technique, oil pipeline route